Procedure
Procedure
- 01
Decide the business type: Based on the number of units and whether you operate jointly, choose individual (one party, 4 units or fewer) or general (5 or more units or joint operation); for joint operation, the representative and every member must own construction machinery.
- 02
Calculate the parking yard area: Use the Annex 14 formula (24㎡ × number of non-tower-crane units to the power of 0.815 + 80㎡ × number of tower cranes to the power of 0.815), counting each crawler-type unit as half a unit.
- 03
Check the parking yard site: Before signing for the land, use the lot number to confirm that a parking yard is permitted in the zoning, that the surface is level with an access road for transport trailers, and that it is in the same city or county as the office or an adjoining area allowed by the rules.
- 04
Confirm parking yard possession: File an application on Form No. 29 with the mayor, county head or district head where the yard is located and receive the confirmation within the 7-day processing period; if the land is leased, attach the lease and the lessor's certificate of seal impression or confirmation of personal signature.
- 05
Submit the registration application: File Form No. 28 with proof of machinery ownership, proof of ownership or right of use of the office, and the parking yard confirmation at the office's city, county or district, which checks the standards and issues the registration certificate within the 10-day processing period.
- 06
After registration: Put up the construction machinery parking yard sign under Annex 14-2, check with the registration authority how to switch to rental business number plates (orange background), and sign rental contracts in writing stating the rent and period and keep them.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
If you sign for parking yard land first and it turns out to be in zoning where a parking yard is not permitted, or in an area not allowed relative to the office, the confirmation will not be issued and you cannot register, so check the lot number before signing.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.
