Procedure
Procedure
- 01
Confirm the item and KS number: KS certification is available only for items designated by the Minister after deliberation by the council and announced in the Official Gazette and online. Confirm the KS number that applies to the product and the certification body's item-specific review criteria (sampling method, certification classification by type, grade, designation or model), and prepare separately for each factory if there is more than one.
- 02
Secure a quality manager: The certification review criteria require a qualified quality manager. Designate a person holding a Professional Engineer Quality Management, Engineer Quality Management or Industrial Engineer Quality Management qualification, or a person who completed the 100-hour quality manager training course and passed the exam, and have that person take 16 hours of periodic training every 3 years. In a company with 20 or fewer employees, the quality manager independently performs the role of the quality management department.
- 03
Prepare in-house standards and management rules: Establish in-house standards and management rules based on KS, suited to the company's size, and apply them company-wide. Specify incoming material inspection items, process control items and key manufacturing equipment, product inspection items and quality criteria, testing and inspection equipment, working environment and training plans, and conduct a self-inspection of standardization and quality management at intervals of no more than 1 year.
- 04
File the application after 3 months of records: After accumulating at least the most recent 3 months of records of material inspection, process control, product inspection, equipment management and training carried out according to the in-house standards, submit the product certification application to the certification body. The certification body prepares a review plan and notifies the applicant of the schedule and the review team of 2 or more certification auditors.
- 05
Respond to factory and product assessments and follow-up: In the factory assessment, the records are checked against the certification review criteria; in the product assessment, samples collected and sealed at the factory by the auditor are tested by an accredited testing and inspection body. If the KS or review criteria change after filing, revise the in-house standards as requested, and if a certified factory relocates, file a relocation assessment application within 10 days of completing the move and undergo the relocation assessment within 45 days.
Filing route
Filing route
Confirm the current filing office, jurisdiction, and online availability on the official website.
Official checkDeadlines & processing notes
Deadlines & processing notes
Basic documents
Basic documents
Placing a KS mark or similar mark on products, packaging, delivery notes or promotional materials before receiving the certificate violates Article 15(3) of the Industrial Standardization Act, and records kept differently from the in-house standards lead to a nonconformity finding in the factory assessment, so align the record forms with the in-house standards from the start.
Scope of services
Scope of services
Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.
