17-5 · Building administration

Preparation of application documents regarding change of use for residential lodging facilities and deferment of enforcement fines

A residential lodging facility (saenghwal-sukbak-siseol) is a lodging facility under the Building Act, so using it as a home requires changing its use to an officetel or similar. Lodging facilities belong to the business facility group, while officetels are business facilities in the residential and office facility group, so converting a residential lodging facility into an officetel is a change to a lower facility group and is made by a use change report to the Mayor, county head or district head. The converted building must meet the officetel construction standards. For a residential lodging facility whose building permit was applied for on or before October 16, 2024, a corridor with rooms on both sides may be 1.5 meters or wider instead of 1.8 meters once the competent fire station chief recognizes its fire safety and the local building committee deliberates on it. If the building is used as a home without a change of use and a corrective order is not complied with, charges for compelling compliance are imposed.

HWANG YUNSANG ADMINISTRATIVE OFFICESONGDO · 37.3892° N / 126.6439° E
#Preparation of application documents regarding change of use for residential lodging facilities and deferment of enforcement fines#Official check#17-5
🌐 Preparation of application documents regarding change of use for residential lodging facilities and deferment of enforcement fines
01

Procedure

Procedure

Procedure type
  • Permit Difficulty High

    A procedure that allows a business, activity or stay that the law generally restricts, after review; licenses fall into this type. The authority reviews facility standards, location and consultation with other agencies, and a permit can be refused if the standards are not met.

We will prepare minutes of the unit owners' management body, resolutions, and application documents for change of use. If you meet the local government filing requirements, we will also prepare preliminary application for lodging business report or confirmation of deferral management for existing filing history in a separate process.

Scope & fee
Owners' management body wording and change-of-use notification support
By reviewing the technical documents provided by 1 residential lodging facility with cooking facilities, we will assist you in preparing and submitting 5 pages of expected minutes of the unit owners' management body, 5 pages of resolutions, and change-of-use filing documents for conversion to an officetel. Application for special hallway width is separate. Actual design, performance testing, construction, use approval, new lodging business report, preliminary application, and on-site visit are separate.
Official fee source ↗
Owners' management body wording, change of use and 3 corridor-width exception routes
By reviewing the technical documents provided by 1 residential lodging facility with cooking facilities, we will assist you in preparing and submitting 5 pages of expected minutes of the unit owners' management body, 5 pages of resolutions, and change-of-use filing documents for conversion to an officetel. If special provisions for hallway width are required, we will also prepare application documents for fire safety preliminary confirmation, fire department certification, and building committee deliberation. Actual design, performance testing, construction, use approval, new lodging business report, preliminary application, and on-site visit are separate.
Official fee source ↗
Owners association documents and change-of-use report support — minutes 3 pages, resolution 1 page
By reviewing the technical documents provided by 1 residential lodging facility with cooking facilities, we will assist you in preparing and submitting 3 pages of minutes of the unit owners' management body, 1 page of resolution, and change-of-use filing documents for conversion to an officetel. Application for special hallway width is separate. Actual design, performance testing, construction, use approval, new lodging business report, preliminary application, and on-site visit are separate.
Official fee source ↗
Owners association documents, change of use and corridor-width exception across 3 filing routes — minutes 3 pages, resolution 1 page
By reviewing the technical documents provided by 1 residential lodging facility with cooking facilities, we will assist you in preparing and submitting 3 pages of minutes of the unit owners' management body, 1 page of resolution, and change-of-use filing documents for conversion to an officetel. If special provisions for hallway width are required, we will also prepare application documents for fire safety preliminary confirmation, fire department certification, and building committee deliberation. Actual design, performance testing, construction, use approval, new lodging business report, preliminary application, and on-site visit are separate.
Official fee source ↗
Preparation of preliminary application and deferred management materials for reporting lodging business
We will check whether you are currently eligible for preliminary application with approximately 20 pages of ownership, ordinance, enforcement/imposition, and existing application materials for 1 owner and 1 room. If you meet the application requirements, we will prepare a pre-confirmation/preliminary application form and usage rights/consent materials and submit them to the support center. Final accommodation report, operation, change of use, construction, donation fee cancellation, and on-site visit are separate and do not guarantee deferment.
Official fee source ↗
Submission of confirmation and explanation materials for those already registered and eligible for deferred accommodation management
We compare approximately 20 pages of provided data, including receipts, official documents, and charges/payments for existing preliminary applications or change of use for 1 owner and 1 room, and prepare and submit 2 pages of expected explanatory materials for reception/action history and a confirmation request. New statutory deferral extension applications, donation fee cancellation/appeal, new use change, lodging business report, and on-site visit are separate and do not guarantee deferment.
Official fee source ↗
  1. 01

    1. Check the building register, the permit application date and the district unit plan — Use the building register to confirm that the use is a residential lodging facility within lodging facilities and that the first building permit application (including an application for building committee deliberation) was made on or before October 16, 2024. In a district unit planning zone, a change of use must also conform to the district unit plan, so check whether officetels are a permitted use. Sales contracts for residential lodging facilities must include a confirmation of the duty to report a lodging business and that residential use is allowed only after a change of use, so review the contract documents as well.

  2. 02

    2. Review officetel construction standards and parking — In an officetel, the boundary walls between units must be fire-resistant and meet the prescribed wall thickness or provide sound insulation of 45 dB or more, and on the 16th floor and above the walking distance to a direct staircase must be 40 meters or less. For a residential lodging facility whose first building permit was applied for on or before October 16, 2024, the dedicated officetel entrance and the exclusive area calculation standard may be disapplied, and this fact is entered in the building register. Additional attached parking must be secured for the difference between the number of parking spaces required before and after the change, based on the standards at the time of the change.

  3. 03

    3. Resolution of the management body and consent of unit owners — If reinforcement work changes common areas such as corridors or stairs, a resolution of the management body meeting by at least two-thirds of unit owners and at least two-thirds of voting rights is required. If a change to common areas specially affects the rights of a particular unit owner, that owner's consent is also required. Prepare the meeting notice, minutes and resolution together with the report documents.

  4. 04

    4. Fire safety pre-confirmation, recognition and building committee deliberation (corridor exception) — If the corridor width standard is not met, first apply to the city, county or district for pre-confirmation, which notifies the pre-confirmation result within 20 days. Then apply to the competent fire station chief for fire safety recognition; the performance-based design evaluation panel reviews fire and evacuation simulation results and other materials within 30 days, and if supplementation is decided, a supplementation period of up to 21 days is given. After recognition by the fire station chief, apply for deliberation by the local building committee, whose result is notified in writing within 7 days.

  5. 05

    5. Use change report and use approval — Submit the building, major repair and use change report with the floor plan after the change and drawings showing fire resistance, fire protection, evacuation and building equipment to the Mayor, county head or district head. If the corridor exception applies, also submit the fire safety review result and the main results of the building committee deliberation, and the city, county or district inspects whether construction followed the design documents. If the total floor area of the changed part is 100 square meters or more, the use approval procedure applies, but use approval is not required if the area is under 500 square meters and no major repair work is involved.

02

Filing route

Filing route

Confirm the current filing office, jurisdiction, and online availability on the official website.

Confirm the current filing office, jurisdiction, and online availability on the official website.

Official check
Actual processing agencyCompetent Korean authority or official service
Statutory and policy authorityMinistry of Land, Infrastructure and Transport
Online routeOfficial check
03

Deadlines & processing notes

Deadlines & processing notes

Check deadlines and next steps against the notice, filing date, and any request for additional documents.Official check
04

Fees & official charges

Fees & official charges

Administrative service fee
  • Owners' management body wording and change-of-use notification support from KRW 700,000
  • Owners' management body wording, change of use and 3 corridor-width exception routes from KRW 1,200,000
  • Owners association documents and change-of-use report support — minutes 3 pages, resolution 1 page from KRW 600,000
  • Owners association documents, change of use and corridor-width exception across 3 filing routes — minutes 3 pages, resolution 1 page from KRW 1,000,000
  • Preparation of preliminary application and deferred management materials for reporting lodging business from KRW 300,000
  • Submission of confirmation and explanation materials for those already registered and eligible for deferred accommodation management from KRW 400,000
All administrative service fees exclude 10% VAT.

Included in the basic fee — Initial document review, required-document guidance, basic form preparation, one filing support and responses to up to two supplement requests.

Conditional success fee — For this service, any conditional success fee may be separately agreed within the lawful service scope and stated in a written engagement agreement. No outcome is guaranteed.

Displayed amounts are starting estimates, not statutory or standard rates. The final fee is confirmed after consultation and document review in the engagement agreement. Government fees and actual expenses may change.

Fees & official charges →
05

Basic documents

Basic documents

Basic documents0 / 9

A residential lodging facility in a district unit planning zone must also conform to the district unit plan when its use is changed, so if the plan does not permit officetels, an amendment of the district unit plan is needed before the use change report. If the building committee deliberation after fire safety recognition changes the location or structure of key facilities such as direct staircases or fire compartments, the fire safety recognition procedure must be repeated, so finalize the reinforcement design before the deliberation.

Scope of services

Scope of services

Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.