Land, buildings & compensation

Objecting to Compensation Appraisal of Illegally Altered Land — Minor Alteration Standards and the 30-Day Objection to an Expropriation Ruling

If land included in a public project is classified as illegally altered land, meaning land whose form was changed without the required permit or report, it is appraised by assuming the use at the time the form was changed rather than its current use (Enforcement Rule of the Act on Acquisition of and Compensation for Land for Public Works Projects, Article 24). However, minor alterations that do not require a development activity permit, such as cutting, filling or leveling within 50cm in height or depth, or cutting, filling, leveling or paving without a change of land category on land of 660㎡ or less outside urban areas and similar zones, may be carried out without a permit (National Land Planning and Utilization Act, Article 56(4)3; Enforcement Decree of the same Act, Article 53, Subparagraph 3). By organizing evidence of when the alteration took place and whether a permit was required at that time, the owner can file a written objection during the inspection period of the land record and, if no agreement is reached, continue with a request for adjudication and an objection to the expropriation ruling.

Procedure

Procedure type
  • Appeal Difficulty High

    Submitting an opinion, objection or administrative appeal against a disposition or decision already made, or applying for damage relief or dispute mediation. The reviewing body decides after examining the facts and the law, so preparing supporting evidence is important.

We will prepare land compensation consultation opinions and application/opinion documents related to expropriation decisions and objection decisions. This service does not include the entire appraisal and compensation negotiation.

Scope & fee
Documents for the consultation stage
We will prepare a consultation opinion by organizing the provided records and factual data for 1 land compensation case. Appraisal and on-site negotiation are not included. Scope of writing: 1 type of consultation opinion, 5 pages per type. It does not include in-office submissions.
Documents for the expropriation adjudication
We will prepare an application, opinion, and evidence related to the decision of 1 land expropriation case. The legal submission subject and claim route are confirmed, and appraisal and subsequent objection resolution are separate. Scope of writing: 1 type of acceptance decision application/opinion/5 pages per type. It does not include in-office submissions.
Documents for the objection adjudication
We will review the results of the acceptance decision and the grounds provided, and prepare application/opinion documents related to the objection decision. Preliminary consultation, new acceptance documents, and appraisal are not included. Scope of writing: 1 type of objection resolution application/opinion, 5 pages per type. It does not include in-office submissions.
  1. 1. Check the grounds for classification as illegally altered land

    Check the compensation plan notice, the land record entry on current use, and the appraisal result notice to see on what basis the land was classified as illegally altered land. Illegally altered land means land whose form was changed without a permit or report required by the relevant laws, and it is appraised by assuming the use at the time of the alteration (Enforcement Rule of the Act on Acquisition of and Compensation for Land for Public Works Projects, Article 24).

  2. 2. Establish when the alteration occurred and whether a permit was required

    Collect past aerial photographs, the history of land category changes in the land register, and records of permits such as development activity permits and farmland conversion, and organize by period what alteration took place and when. Cutting, filling or leveling within 50cm in height or depth (calculated cumulatively if done several times, excluding paving) and cutting, filling, leveling or paving without a change of land category on land of 660㎡ or less outside urban areas, natural environment conservation areas and district unit planning zones are minor acts that do not require a permit, and where a city or county planning ordinance sets separate standards within this range, the ordinance applies (Enforcement Decree of the National Land Planning and Utilization Act, Article 53, Subparagraph 3). Because the laws and ordinances at the time of the alteration may differ from current ones, check against the standards in force at that time.

  3. 3. Submit a written objection and opinion within the inspection period

    The project operator makes the compensation plan available for inspection for at least 14 days after announcement or notice, and an owner who disagrees with the use stated in the land record may file a written objection with the project operator within this inspection period (Act on Acquisition of and Compensation for Land for Public Works Projects, Article 15(2) and (3)). Submit the objection and an opinion letter with evidence that no permit was required at the time of the alteration or that a permit was lawfully obtained, and use the same evidence during consultation to request an explanation of the appraisal grounds.

  4. 4. Request adjudication if no agreement is reached

    If no agreement is reached after the public notice of project approval, the landowner may submit a written request for adjudication to the project operator after the consultation period ends (Act on Acquisition of and Compensation for Land for Public Works Projects, Article 30(1); Enforcement Decree of the same Act, Article 14(1)). The project operator must apply for adjudication to the competent land expropriation committee within 60 days of receiving the request, and if it misses this deadline, an additional amount for the delayed period is added to the adjudicated compensation (same Act, Article 30(2) and (3)).

  5. 5. Object to the expropriation ruling

    If you disagree with the appraisal in the expropriation ruling, file an objection with the Central Land Expropriation Committee within 30 days of receiving the original copy of the ruling, attaching a copy of the original ruling to the objection form (Act on Acquisition of and Compensation for Land for Public Works Projects, Article 83; Enforcement Decree of the same Act, Article 45(1)). For a ruling by a local land expropriation committee, the objection is submitted through that local committee, and the reasons should be organized around evidence showing when the alteration occurred and whether a permit was required at that time.

Required documents

  • Objection form (Enforcement Rule of the Act on Acquisition of and Compensation for Land for Public Works Projects, Annex Form No. 21, when objecting to an expropriation ruling)
  • Request for adjudication (no annex form; prepared according to the items listed in Article 14(1) of the Enforcement Decree of the same Act)
  • Objection to the land record and opinion letter during consultation (no prescribed form; submitted in writing)
  • Compensation plan notice, land record, consultation request, and appraisal result notice
  • Original copy of the expropriation ruling and postal delivery records showing the date of receipt
  • Land register (including history of land category changes), land registration certificate, and cadastral map
  • Aerial photographs by year and current site photographs
  • Records of permits such as development activity permits and farmland conversion, and work records from the time of the alteration (if any)

Fees

Administrative service fee
  • Documents for the consultation stage from KRW 600,000
  • Documents for the expropriation adjudication from KRW 500,000
  • Documents for the objection adjudication from KRW 500,000
All administrative service fees exclude 10% VAT.

There is no fee for the objection form for an expropriation ruling (Annex Form No. 21). Our office fee starts from the amount shown above and may vary depending on the number of parcels included, the volume of land history records, and the stage of the procedure (objection to the land record, request for adjudication, or objection to the ruling); we will give you an exact quote after reviewing your documents.

Legal basis and review date

  • Act on Acquisition of and Compensation for Land for Public Works Projects, Articles 15, 30 and 83
  • Enforcement Decree of the Act on Acquisition of and Compensation for Land for Public Works Projects, Articles 14 and 45
  • Enforcement Rule of the Act on Acquisition of and Compensation for Land for Public Works Projects, Article 24 and Annex Form No. 21
  • National Land Planning and Utilization Act, Article 56
  • Enforcement Decree of the National Land Planning and Utilization Act, Article 53

Checked against the statutes on

Statutes and public notices change, so each case needs to be checked individually. Statute titles are given in English for reference. The Korean statutes are the authoritative text.

Check these first

  • An objection to an expropriation ruling cannot be filed more than 30 days after receiving the original copy of the ruling, so confirm the date of receipt with postal delivery records (Act on Acquisition of and Compensation for Land for Public Works Projects, Article 83(3)).
  • Whether an alteration was minor enough not to require a permit is judged by the laws and city or county ordinances in force at the time of the alteration, so for alterations made long ago, check the standards at that time and any transitional provisions with the project operator and the competent city or county.

Frequently asked questions

How is compensation appraised if land is classified as illegally altered land?
It is appraised by assuming the use at the time the land's form was changed, not its current use (Enforcement Rule of the Act on Acquisition of and Compensation for Land for Public Works Projects, Article 24). For example, if a rice paddy was filled in without a permit and used like a building site, it may be appraised based on its use before the alteration, so you need to check whether a permit was required at the time.
Is there a range within which soil can be filled or cut without a permit?
Yes. Cutting, filling or leveling within 50cm in height or 50cm in depth can be done without a development activity permit; if done several times, it is calculated cumulatively, and paving is excluded (Enforcement Decree of the National Land Planning and Utilization Act, Article 53, Subparagraph 3, Item (a)). Outside residential, commercial and industrial areas, this applies only when there is no change of land category, and if a city or county ordinance sets separate standards within this range, those standards apply.
Can land of 660㎡ or less be paved without a permit?
Only outside urban areas, natural environment conservation areas and district unit planning zones, and only when there is no change of land category (Enforcement Decree of the National Land Planning and Utilization Act, Article 53, Subparagraph 3, Item (b)). The area is based on the total area of the parcel where the alteration takes place, so check both the zoning and the total parcel area.
By when must I object to the classification as illegally altered land?
The deadline differs by stage. An objection to the land record must be filed in writing with the project operator within the inspection period of the compensation plan (Act on Acquisition of and Compensation for Land for Public Works Projects, Article 15(3)), and an objection to the expropriation ruling must be filed within 30 days of receiving the original copy of the ruling (same Act, Article 83(3)). If the matter is not resolved during consultation, a request for adjudication can move the case into the adjudication procedure (same Act, Article 30).
Can I entrust documents related to illegally altered land to an administrative agent?
Yes. Hwang Yunsang Administrative Office organizes land history records such as aerial photographs, past land categories and permit records, and prepares and submits on your behalf the objection to the land record, the opinion letter during consultation, the request for adjudication, and the objection to the expropriation ruling. The compensation appraisal and the ruling are determined by the appraisal and the land expropriation committee.

Contact us

Hwang Yunsang Administrative Office in Songdo, Incheon prepares and submits administrative documents and explains the procedure. If your situation is similar, send us a message.

📍 2697, 26F POSCO Tower-Songdo, 165 Convensia-daero, Yeonsu-gu, Incheon, Republic of Korea · 📞 010-3374-2687 · 🌐 hwangadmin.com

This guide is general information based on public sources. Requirements, documents and deadlines differ by case and by the competent agency, so please confirm them before you proceed.