Environmental & waste permits
Nature Conservation Project Agent Registration Requirements — 5 Technical Staff, 500,000,000 won Corporate Capital, 20-Day Processing
A nature conservation project agent is a business that carries out the design and construction, as well as the follow-up management and monitoring, of nature conservation projects such as nature restoration projects, ecosystem conservation charge refund projects and substitute nature creation projects on behalf of the project operator, and it must register under Article 50-2 of the Natural Environment Conservation Act. To register, you need the 5 technical staff listed in Annex 3 of the Enforcement Decree, an office for the work, and capital of at least 500,000,000 won for a corporation or at least 1,000,000,000 won for an individual. The application is filed with the Nature Restoration Support Center, and the processing period is 20 days for registration and 7 days for change registration. After registration, you must file a change registration within 60 days of any change in trade name, representative, location, technical staff or capital, and report your annual agency performance by the end of February of the following year.
Procedure
1. Confirm the scope of projects
The projects covered are nature restoration projects, ecosystem conservation charge refund projects, substitute nature creation projects, and projects creating storage facilities and constructed wetlands among non-point pollution reduction facilities. A registered agent may take on the design and construction of these projects and the follow-up management and monitoring of projects whose design and construction are complete. Acting as an agent for these projects without registration is a criminal offense, so complete registration before taking orders.
2. Secure 5 technical staff
You need 1 Professional Engineer Natural Environment Management, 2 Engineers or Industrial Engineers Natural Ecosystem Restoration (1 of whom may be replaced by an Engineer Biological Classification), 1 Engineer Landscape Architecture or intermediate-level landscaping technician, and 1 civil engineering construction technician or forest engineering technician. All must be full-time employees, and anyone whose qualification is suspended does not count. Even if one person falls under two or more categories, that person counts as only 1.
3. Prepare an office and capital
You must have an office needed for the work and capital of at least 500,000,000 won for a corporation or at least 1,000,000,000 won for an individual. For a stock company this means paid-in capital, for other corporations the contributed capital, and for an individual the appraised value of business assets. A construction business operator under the Framework Act on the Construction Industry does not have to duplicate the technical capability, office and capital already held under the construction business registration standards.
4. Apply to the Nature Restoration Support Center
Attach the office lease agreement, the technical staff list and qualification documents, and, for individuals, a statement of business assets with supporting documents to the nature conservation project agent registration application, and submit it to the Nature Restoration Support Center. The corporate register, building register and building ledger, and national technical qualification certificates are checked by the Center through shared administrative information. The processing period is 20 days with no fee, and once the requirements are met a registration certificate is issued and the registration is announced on the Center's website.
5. Change registration and performance reports
If the trade name or name, representative, location, technical staff or capital changes, apply for change registration within 60 days of the change. Submit the annual agency performance report with supporting documents to the Center by the end of February of the following year. The Ministry of Climate, Energy and Environment checks whether the requirements are maintained at least 2 times a year, so replace any technical staff who leave right away.
Required documents
- Nature conservation project agent registration application (Enforcement Rule of the Natural Environment Conservation Act, Form No. 14-2)
- Office lease agreement (if the office is leased)
- List of technical staff
- Documents proving the qualifications of technical staff (national technical qualification certificates are checked by the Center)
- Statement of business assets and supporting documents (for individuals)
- Letter of authorization (when filed by an agent)
Fees
Typically from the 100,000s of won to the 1,000,000s of won in the industry · We give a quote after consultation depending on whether you are a corporation or an individual, the status of your technical staff, whether construction business registration is credited, and whether it is a new registration or a change registration. Government fees are separate.
Legal basis and review date
- Natural Environment Conservation Act, Article 45-9
- Natural Environment Conservation Act, Article 50-2
- Natural Environment Conservation Act, Article 50-3
- Natural Environment Conservation Act, Article 50-4
- Natural Environment Conservation Act, Article 64
- Natural Environment Conservation Act, Article 66
- Enforcement Decree of the Natural Environment Conservation Act, Article 46-2
- Enforcement Decree of the Natural Environment Conservation Act, Article 46-3
- Enforcement Decree of the Natural Environment Conservation Act, Annex 3
- Enforcement Decree of the Natural Environment Conservation Act, Annex 4
- Enforcement Rule of the Natural Environment Conservation Act, Article 36-2
- Enforcement Rule of the Natural Environment Conservation Act, Article 36-3
- Enforcement Rule of the Natural Environment Conservation Act, Article 36-4
- Enforcement Rule of the Natural Environment Conservation Act, Article 36-5
- Enforcement Rule of the Natural Environment Conservation Act, Annex 2-5
Check these first
- If you sign a new nature conservation project contract during a business suspension, your registration is canceled and you cannot register again for 2 years from the date of cancellation.
- The annual agency performance report is due by the end of February of the following year, so keep the contract and completion documents for each project.
Frequently asked questions
Where do I register as a nature conservation project agent?
If I hold a construction business registration, do I need separate capital?
What happens if I carry out ecological restoration work as an agent without registration?
Is my registration canceled if a technical staff member leaves?
Does an administrative agent handle nature conservation project agent registration?
Contact us
Hwang Yunsang Administrative Office in Songdo, Incheon prepares and submits administrative documents and explains the procedure. If your situation is similar, send us a message.
📍 2697, 26F POSCO Tower-Songdo, 165 Convensia-daero, Yeonsu-gu, Incheon, Republic of Korea · 📞 010-3374-2687 · 🌐 hwangadmin.com
This guide is general information based on public sources. Requirements, documents and deadlines differ by case and by the competent agency, so please confirm them before you proceed.