12-3 · Livestock product processing & distribution

Meat Processing Business (Livestock Product Processing) Permit and Product Manufacturing Report

To manufacture processed meat products such as ham, sausage, bacon, dried and cured meat, or seasoned meat for supply or distribution, a meat processing business permit (a type of livestock product processing business) must be obtained for each workplace under Article 22 of the Livestock Products Sanitary Control Act. The statutory permitting authority is the Mayor/Do Governor of the province or metropolitan city where the workplace is located, and some regions have delegated this authority to the city, county, or district office. The authority must notify the applicant of its decision within 8 days of receiving the application, and if it gives no notice of the decision or of an extension of the processing period within that time, the permit is deemed granted. Under Annex 10 of the Enforcement Rule, the workplace must be separated from facilities used for other purposes, have lighting of at least 220 lux, and have equipment that keeps the processing room at or below 15 degrees Celsius, and meat processing business operators are required to comply with the Hazard Analysis and Critical Control Point (HACCP) standards. After the permit is granted, a product manufacturing report must be filed for each product before production starts or within 7 days after it starts under Article 25 of the same Act, and a permit cannot be granted in cases listed in Article 22(3), such as applying for the same type of permit at the same location within 1 year after a previous permit there was revoked.

HWANG YUNSANG ADMINISTRATIVE OFFICESONGDO · 37.3892° N / 126.6439° E
#Meat Processing Business (Livestock Product Processing) Permit and Product Manufacturing Report#Official check#12-3
🌐 Meat Processing Business Permit Requirements and Item Manufacturing Report
01

Procedure

Procedure

  1. 01

    Determining whether a permit is required and which business type applies: Processing meat by adding seasoning or additives is a meat processing business, cutting or grinding meat and packaging it as is falls under a meat packaging business, and a butcher shop selling processed meat products it makes directly to final consumers files a report as an on-site meat sales and processing business. Meal kits (simple meat cooking sets) fall within the meat processing business when their main ingredient is meat the operator cut itself or processed meat products it made itself.

  2. 02

    Checking the workplace location and designing facilities to the standards: Before signing a lease, the permitted use is checked through the building register and the land use plan confirmation, and the raw material room, processing room, and packaging room are placed in a separate building or separated from facilities used for other purposes by walls or floors, then separated or partitioned from one another. Floors must be waterproofed and drain well, interior walls must have a light-colored water-resistant finish up to 1.5 meters from the floor, and automated equipment is required from ingredient mixing to packaging, except where the nature of the product, such as bacon or dried and cured meat, makes automation difficult.

  3. 03

    Preparing the laboratory, water supply, and HACCP layout: A laboratory capable of testing processing standards and specifications is required, but it may be omitted if self-testing is outsourced to a designated livestock product testing and inspection institution. If groundwater is used, the water source must be at least 20 meters away from toilets, waste treatment facilities, and similar sites, and a water quality test report is obtained in advance. Because meat processing businesses must comply with HACCP, the separation of clean zones and work flow are reflected in the first floor plan.

  4. 04

    Applying for the permit after hygiene training: The person intending to operate the business first completes 6 hours of livestock product hygiene training. The business permit application is submitted with the workplace facility details and layout and, where applicable, the water quality test report, and the permitting authority issues the permit after reviewing the documents and conducting an on-site inspection. The corporate register, building register, land use plan confirmation, and health certificate are checked by the official through shared administrative information.

  5. 05

    Product manufacturing reports and post-permit management: For each product, a product manufacturing report is filed with a description of the manufacturing method and a statement of the basis for the shelf life before production starts or within 7 days after it starts, and a change report is filed within 7 days if the product name, ingredient mixing ratios, or shelf life change. A change permit is required to change the business location or the raw material room, manufacturing and processing room, or packaging room, and the business operator completes 3 hours of hygiene training every year.

02

Filing route

Filing route

Livestock product sanitation department of the province or metropolitan city where the workplace is located (or the city, county, or district office in regions where permitting authority has been delegated)

Confirm the current filing office, jurisdiction, and online availability on the official website.

Official check
Actual processing agencyCompetent Korean authority or official service
Statutory and policy authorityMinistry of Food and Drug Safety
Online routeGovernment24 · Competent Korean authority or official service
03

Deadlines & processing notes

Deadlines & processing notes

Check deadlines and next steps against the notice, filing date, and any request for additional documents.Official check
04

Basic documents

Basic documents

Basic documents0 / 8

If, after the lease and interior work are completed, the temperature control equipment in the processing room or the partitioning of the raw material, processing, and packaging rooms does not meet the facility standards or the HACCP work flow, the work has to be redone, and changing these rooms after the permit requires a change permit, so the floor plan is finalized before signing the lease.

Scope of services

Scope of services

Hwang Yunsang Administrative Agent Office prepares and translates documents for administrative agencies, submits them on your behalf, and guides you through permit, application, and notification procedures. Services that require the principal’s personal appearance, principal’s application, or electronic signature may be limited in delegation.