Livestock product processing & distribution

Meat Packaging Business Permit — Workplace Standards and Mandatory HACCP Schedule

To cut, package and distribute meat, you need a meat packaging business permit under the Livestock Products Sanitary Control Act. The building must in principle be for factory use, and a residential building is not allowed. HACCP is being made mandatory in stages by sales volume and applies to all businesses from January 1, 2029, so it is advisable to match the permit drawings to the HACCP standards from the start.

Procedure

  1. 1. Check the building use first

    The workplace must in principle be for factory use, and in some cases a Class 2 neighborhood living facility is also possible under local government ordinance. A permit is not granted for a residential building, so check the use in the building register before signing the lease.

  2. 2. Design the workplace facilities

    Separate the raw material storage room, the cutting room and the packaging room, and lay out the movement routes so that cross-contamination is prevented. The workplace must be able to maintain illuminance of 220 lux or more and a room temperature of 15°C or lower.

  3. 3. Prepare the drawings together with the HACCP standards

    HACCP is mandatory from 2023 for sales of 2,000,000,000 won or more, from 2025 for sales of 500,000,000 won or more, from 2027 for sales of 100,000,000 won or more, and from January 1, 2029 for all businesses. If the permit drawings are matched to the HACCP standards, construction does not have to be done again later.

  4. 4. Permit application and item manufacturing report

    After the facilities are in place, apply for the permit to the competent city, county or district (si/gun/gu) office and undergo an on-site check. File the item manufacturing report before starting production or within 7 days after starting, and have the basis for setting the use-by date ready at that time.

Required documents

  • Business permit application
  • Workplace floor plan and facility layout drawing
  • Building register (to confirm the use); lease contract
  • Water quality test report (when groundwater is used)
  • Certificate of completion of sanitation education
  • Item manufacturing report; materials supporting the use-by date

Fees

The permit application fee follows the standard of the competent local government. In the industry, fees for permit application services generally run from several hundred thousand won to the 1,000,000 won range and vary depending on the scope of drawing review and HACCP-related work. We will advise after reviewing the building and equipment plan in a consultation.

Legal basis and review date

  • Livestock Products Sanitary Control Act, Article 22
  • Livestock Products Sanitary Control Act, Article 9
  • Livestock Products Sanitary Control Act, Addenda (Act No. 17811)
  • Livestock Products Sanitary Control Act, Article 25
  • Enforcement Rule of the Livestock Products Sanitary Control Act, Article 37
  • Enforcement Rule of the Livestock Products Sanitary Control Act, attached Table 10

Checked against the statutes on

Statutes and public notices change, so each case needs to be checked individually. Statute titles are given in English for reference. The Korean statutes are the authoritative text.

Check these first

  • A permit is not granted for a residential building, so check the use before signing the lease.
  • As the date HACCP becomes mandatory approaches, check in advance that the permit drawings match the standards.

Frequently asked questions

Is a meat packaging business subject to a report or a permit?
It is subject to a permit under the Livestock Products Sanitary Control Act. You may operate only after meeting the facility standards and passing the check by the competent city, county or district (si/gun/gu) office.
Does a meat packaging business also need HACCP?
Yes. It is mandatory from 2023 for sales of 2,000,000,000 won or more, from 2025 for sales of 500,000,000 won or more, and from January 1, 2027 for sales of 100,000,000 won or more, and it applies to all businesses from January 1, 2029.
Can I run a meat packaging business in a commercial building?
Factory use is the principle, but in some areas it is possible in a Class 2 neighborhood living facility under ordinance. A residential building is not allowed, so check the standards of the competent local government before signing a contract.
When must the item manufacturing report be filed?
Before starting production or within 7 days after starting. Supporting materials on how the use-by date was set are required.
Are there standards for workplace temperature and lighting?
The workplace must be able to maintain illuminance of 220 lux or more and a room temperature of 15°C or lower. The raw material storage, cutting and packaging spaces must also be separated, with movement routes that prevent cross-contamination.

Contact us

Hwang Yunsang Administrative Office in Songdo, Incheon prepares and submits administrative documents and explains the procedure. If your situation is similar, send us a message.

📍 2697, 26F POSCO Tower-Songdo, 165 Convensia-daero, Yeonsu-gu, Incheon, Republic of Korea · 📞 010-3374-2687 · 🌐 hwangadmin.com

This guide is general information based on public sources. Requirements, documents and deadlines differ by case and by the competent agency, so please confirm them before you proceed.