Environmental & waste permits
Permit Procedure for an Intermediate Waste Disposal Business — Notice of Suitability of the Business Plan and Facility and Technical Personnel Standards by Disposal Method
An intermediate waste disposal business is a business of intermediate disposal of waste by methods such as incineration, mechanical disposal, and chemical or biological disposal. First submit a waste treatment business plan and receive a notice of suitability, then put in place the facilities, equipment and technical capability within the deadline and apply for the permit. Designated waste is handled by the Ministry of Climate, Energy and Environment (regional environmental offices), and other waste by the metropolitan city or province (si/do).
Procedure
1. Decide the disposal method and the waste to be handled
First decide which of incineration, mechanical disposal, and chemical or biological disposal you will carry out, and the types of waste to be disposed of. The minimum facility capacity and the qualifications of technical personnel differ by method.
2. Submit the waste treatment business plan
Attach the disposal plan (plans for facility installation, equipment and securing technical capability) to the business plan and submit it to the metropolitan city or province (si/do) or the regional environmental office having jurisdiction over the planned site of the facility. If the facility is an emission facility, also submit the documents for the emission facility permit or report; if it is an incineration facility, also submit an environmental review report.
3. Review of suitability
The administrative agency reviews the grounds for disqualification, whether the location conflicts with other statutes, whether the facilities, equipment and technical capability meet the permit standards, and the effect on the water quality of water supply sources and on environmental standards, and then gives notice of whether the plan is suitable. Location restrictions, a mismatch between treatment capacity and volume, and differences in figures between documents often come up as grounds for unsuitability.
4. Install the facilities and secure personnel
Put in place the facilities, equipment and technical personnel within 2 years from the date of receiving the notice of suitability (3 years if an incineration facility must be installed). If there is an unavoidable reason such as a natural disaster, you can apply for an extension of up to 1 year in total.
5. Apply for the permit
Attach the specifications of the facilities and equipment and the qualification documents for technical capability to the permit application form and submit it. If you meet the requirements in accordance with the plan for which the notice of suitability was given and apply, the administrative agency grants the permit without delay.
Required documents
- Waste treatment business plan
- Disposal plan for the waste to be disposed of (including plans for facility installation, equipment and securing technical capability)
- Documents attached to the application for an emission facility installation permit or to the report (if the facility is an emission facility)
- Environmental review report (for an incineration facility; can be replaced by the assessment report if subject to environmental impact assessment)
- Permit application form and specifications of facilities and equipment
- Status of technical capability held and documents proving qualifications
- Documents showing the right to use the site and building
Fees
Service fees in the industry for preparing the business plan and permit documents start from around several million won and vary greatly with the disposal method, whether an environmental review report is required, and the number of supplementation rounds. We will advise you after a consultation based on your facility plan.
Legal basis and review date
- Wastes Control Act, Article 25
- Enforcement Rule of the Wastes Control Act, Article 28
- Enforcement Rule of the Wastes Control Act, attached Table 7
Check these first
- Before a site contract or an equipment order, first check whether the location conflicts with other statutes.
- Make the treatment capacity and volume figures identical across the business plan, the disposal plan and the emission facility documents.
Frequently asked questions
Can I apply for an intermediate waste disposal business permit right away?
By when must the permit be obtained after the notice of suitability?
What are the minimum facility standards by disposal method?
How many technical personnel are required?
If I haul in the waste myself, is a separate collection and transport business permit required?
Does an administrative agent prepare the waste treatment business permit documents on my behalf?
Contact us
Hwang Yunsang Administrative Office in Songdo, Incheon prepares and submits administrative documents and explains the procedure. If your situation is similar, send us a message.
📍 2697, 26F POSCO Tower-Songdo, 165 Convensia-daero, Yeonsu-gu, Incheon, Republic of Korea · 📞 010-3374-2687 · 🌐 hwangadmin.com
This guide is general information based on public sources. Requirements, documents and deadlines differ by case and by the competent agency, so please confirm them before you proceed.
